Energy: what the Canada-UAE agreements cover and what they leave out

A NordGulf Institute publication

The trade agreement (the CEPA) leaves the UAE's oil and gas sector out completely: a special annex says the agreement gives Canada no rights there and that each emirate decides for itself. The UAE has also made no commitments on energy services. Energy equipment is treated differently: most of it, from wind generating sets to gas turbines and lithium-ion batteries, will enter the UAE free of customs duty from the day the agreement takes effect. The CEPA was signed on 27 October 2026 and is not yet in force.
Last checked 22 November 2026

Key facts

Oil and gas in the UAE
Excluded from the CEPA by Annex I. The agreement creates no rights for Canada and no obligations for the UAE in that sector
Who decides on oil and gas
Each of the seven emirates, for its own territory
Energy services
The UAE offers no commitments in "energy and energy related services"
Solar cells and panels
Already 0% duty. Stays at 0%
Wind generating sets, gas and steam turbines, nuclear reactors, hydrogen, lithium-ion batteries
5% today. Duty free from the first day
Slower cuts
Some transformers and lead-acid batteries reach 0% in year six. Propane and nickel-cadmium batteries in year four
Steel pipe and power cable
Many lines are marked with an asterisk. Their duty cut is on hold until Canada removes its own surtax on those goods
Investment agreement (FIPA)
The FIPA, in force since 19 May 2026, does not treat concessions to explore for or extract natural resources as protected investments. Renewable energy is not counted as a natural resource for this purpose

01The short answer

For a Canadian company the CEPA changes the cost of selling energy equipment into the UAE and changes nothing about access to UAE oil and gas. Equipment mostly becomes duty free. Oil and gas rights, licences and contracts stay entirely a matter for each emirate, outside the agreement.

AreaWhat the agreements do
Oil, gas and condensates (light liquids recovered with natural gas) in the UAE, from ownership and exploration to refining and retailOutside the CEPA (Annex I)
Energy services in the UAENo UAE commitments in the CEPA
Canadian energy equipment sold to the UAEMostly duty free from day one. A few items phased over four or six years. Some steel pipe and cable on hold
A Canadian investment in the UAE energy sectorProtected by the FIPA once lawfully made, except concessions to explore for or extract natural resources
Clean technology and renewable energyNamed as an area for cooperation between the governments. No binding commitments

02Oil and gas: left out by Annex I

Annex I takes the UAE's oil and gas sector out of the agreement. Canada gains no rights in it, and the UAE and its seven emirates take on no obligations. The sector is oil, gas and condensates and what is made from them, at every stage.

What the annex covers

The annex calls this the Energy Resources Sector. In its words, the CEPA "shall not grant any rights to Canada or create any obligations for the UAE or any of its Member Emirates" in that sector. The sector covers:

  • Hydrocarbons "such as oil, gas, and condensates", their derivatives and primary by-products.
  • Every stage: ownership, management, exploration, development and production, reservoir management, transportation, storage, refining and processing, and distribution, including retail distribution.

What the annex records about the emirates

  • The UAE is a federation of seven emirates. The annex records that under the UAE Constitution each emirate keeps full control of its own natural resources in this sector and alone decides what happens to them.

What follows from it

  • Decisions made by an emirate's competent authorities in the sector are "final, binding, and not subject to review or challenge".
  • The sector is outside the scope of the whole agreement, including the chapter on disputes between the two governments.
  • If the annex conflicts with any other part of the agreement, the annex wins.
  • The annex concerns the sector in the UAE. It says nothing about the energy sector in Canada.

If the UAE later gives more to another country

  • If the UAE, with the agreement of the emirates' authorities, signs a trade agreement that gives a third country any of the rights excluded by the annex, the same right "shall be granted to Canada".

03If the two governments disagree about Annex I

There is a short procedure of its own, between governments only. They hold confidential consultations for up to 60 days. If that fails, Canada's only remedy is to withdraw trade benefits of matching size. No panel, court or other procedure is available.

  • Either government can ask for confidential consultations about how the annex is read or applied.
  • They are to try to reach a solution within 60 days of the request.
  • If there is no solution, or the UAE does not carry out an agreed solution in the agreed time, Canada may withdraw some of the advantages the agreement gives the UAE, such as a tariff cut, in proportion to the effect the UAE's action has on trade. The annex calls this suspending benefits. That is the only thing Canada can do.
  • If the UAE withdraws the action that caused the dispute, Canada must lift its response.
  • If the UAE considers Canada's response out of proportion, the same procedure applies in reverse and the UAE may in the end withdraw advantages from Canada in the same proportionate way.
  • Neither government may take the matter to any other proceeding, under the agreement or anywhere else.

04Energy services: no UAE commitments

The UAE's list of service sectors in the CEPA does not include energy. A footnote states: "The UAE will not offer any commitments in energy and energy related services."

  • In the services chapter each country lists the sectors in which it guarantees a minimum level of access for the other country's service companies. The UAE's list is Annex 8-B.
  • Energy and energy-related services are not on that list. The agreement therefore guarantees nothing to a Canadian company supplying such services in the UAE, and takes nothing away. The UAE's own laws and each emirate's rules apply, as they do today.
  • The footnote is wider than Annex I. Annex I is about hydrocarbons. The footnote speaks of energy services in general and does not separate oil and gas from other forms of energy.
  • The agreement does not define "energy related services".
  • Commitments in other listed sectors, such as engineering or construction, are described under Services and setting up in the UAE.

05Duties on energy equipment

Most energy equipment made in Canada will enter the UAE free of customs duty from the day the CEPA takes effect. The usual UAE duty on these goods today is 5%. A small number of items lose the duty in steps over four or six years.

How to read the table

  • Base rate: the duty the UAE applied on 1 January 2025. It is the starting point for the cuts.
  • Category A: duty free on the day the agreement takes effect.
  • Category B: the duty falls in four equal yearly steps and reaches zero on 1 January of year four.
  • Category C: six equal yearly steps, zero on 1 January of year six.
  • Category E: not covered by a cut. The UAE's general duty applies (5% today).
  • Year one runs from the day the agreement takes effect to 31 December of that year. Each later step falls on 1 January.
  • The eight-digit numbers are the UAE's tariff codes. The first six digits are the same worldwide.
ProductUAE tariff codeBase rateCategory
Solar cells, whether or not assembled into panels8541.42.00, 8541.43.000%A
Photovoltaic AC generators8501.80.005%A
Wind-powered generating sets8502.31.005%A
Diesel generating sets, all sizes8502.11.00 to 8502.13.005%A
Hydraulic turbines8410.11.00, 8410.12.005%A
Steam turbines of more than 40 MW8406.81.005%A
Gas turbines of more than 5,000 kW8411.82.005%A
Nuclear reactors and parts8401.10.00, 8401.40.005%A
Machines for electrolysis8543.30.000%A
Hydrogen2804.10.005%A
Lithium-ion batteries8507.60.005%A
Nickel-cadmium batteries8507.30.005%B
Lead-acid batteries8507.10.00, 8507.20.005%C
Liquid-filled transformers of more than 10,000 kVA8504.23.005%A
Liquid-filled transformers up to 10,000 kVA8504.21.00, 8504.22.005%C
Other transformers, over 1 kVA and up to 16 kVA8504.32.005%B
Other transformers, over 16 kVA and up to 500 kVA8504.33.005%C
Parts of transformers and converters8504.90.005%C

Conditions

  • The lower duty applies only to "originating" goods. These are goods that count as made in Canada under the agreement's rules, and a certificate of origin is needed. See Rules of origin and the certificate of origin.
  • From the day the agreement takes effect the UAE may not raise an existing duty or add a new one on originating Canadian goods, unless the agreement provides otherwise.
  • The table gives examples. The full method is on the Tariffs page. The other machinery lines are on the Machinery and electrical page.

06Steel pipe and cable: the asterisk

Many steel pipes used in oil and gas work, and some power cable, are marked with an asterisk in the UAE's schedule. For these the duty cut does not start when the agreement takes effect. It starts 30 days after Canada tells the UAE in writing that it no longer applies a surtax, which is an extra import charge, on those goods.

ProductUAE tariff codeBase rateCategory
Seamless line pipe for oil or gas pipelines, stainless steel7304.11.005%B, with asterisk
Seamless line pipe for oil or gas pipelines, other steel7304.19.005%C
Seamless drill pipe7304.22.00, 7304.23.005%A, with asterisk
Seamless casing and tubing, stainless steel7304.24.005%E
Seamless casing and tubing, other steel7304.29.005%C
Large welded line pipe, longitudinally submerged arc welded7305.11.005%A
Large welded line pipe, other longitudinally welded7305.12.005%A, with asterisk
Large welded casing for oil or gas drilling7305.20.005%A, with asterisk
Electric cable for a voltage of more than 1,000 V8544.60.10, 8544.60.205%A, with asterisk
  • Category A with asterisk: the goods become duty free 30 days after Canada's notice, not on day one.
  • Category B with asterisk: the four yearly steps begin 30 days after Canada's notice.
  • Until then the UAE's normal duty applies to these goods.
  • Canada has not given that notice. The date is not known.
  • Either government can ask the agreement's Committee on Trade in Goods to meet to discuss the asterisk lines, including whether the duties on them can be removed.
  • The steel and metals page explains the rule in full: Steel and metals.
  • Product names in the table follow the headings of the international Harmonized System, which the UAE tariff uses.

07Duties on fuels and electricity

The UAE's tariff schedule lists crude oil, natural gas, most refined fuels and electricity in category A, with a base rate of 5%. Propane is in category B, and base oils and several lubricating oils are in category C.

ProductUAE tariff codeBase rateCategory
Crude petroleum oil2709.00.005%A
Natural gas, liquefied2711.11.005%A
Natural gas, in gaseous state2711.21.005%A
Propane2711.12.005%B
Butanes2711.13.005%A
Base oils2710.19.115%C
Other lubricating oils (greasing oil)2710.19.985%C
Electrical energy2716.00.005%A
  • The same agreement contains Annex I. That annex takes the UAE's oil and gas sector out of the agreement and overrides any other part that conflicts with it.
  • The agreement does not spell out how the tariff lines for hydrocarbon products and Annex I work together in practice. That will be seen once the agreement is in force and UAE customs publish their procedure for Canada.

08Energy investments and the FIPA

The investment agreement between Canada and the UAE (the FIPA) is a separate agreement and has been in force since 19 May 2026. It protects a Canadian investment in the UAE once it has been lawfully made. It does not count a concession to explore for or extract natural resources as a protected investment, and it gives no right to enter any sector.

  • The FIPA's list of protected assets includes rights under a concession, which is a right granted by the state to run an activity. It then excludes concessions "for the exploration and exploitation of natural resources".
  • A footnote records the two governments' understanding that "natural resources" in that phrase "does not relate to renewable energy".
  • Other kinds of asset on the list include a company, shares, loans, construction and turnkey contracts, and property.
  • The FIPA does not cover setting up or acquiring an investment. Whether and how a foreign company may enter an energy activity in the UAE is decided by UAE law and, for oil and gas, by the emirate concerned.
  • The FIPA says the fee for a permit application should be reasonable and in line with the cost of handling it. Payments for the use of natural resources, royalties and payments made in a tender do not count as permit fees, so that rule does not apply to them.
  • Annex I is part of the CEPA. The FIPA has its own text and its own exceptions, described under Investment protection (the FIPA).

09Cooperation and what the governments have announced

The CEPA names "clean technologies and renewable energy" as one of the areas in which the two governments may cooperate. This is not a binding commitment. Outside the agreement, the governments have announced an energy cooperation arrangement and a large UAE investment plan for Canada in which energy is one of the named sectors.

In the agreement

  • The economic cooperation chapter lists clean technologies and renewable energy among nine named areas. Cooperation depends on what each government is able to put into it, such as money and staff.
  • The agreement's dispute settlement system does not apply to that chapter.

Announced by the governments

  • On 27 October 2026 the Government of Canada announced that Masdar, the Abu Dhabi renewable energy company, and Natural Resources Canada had signed an Energy Cooperation Arrangement. The release describes it as a cooperation framework in the energy sector that brings together UAE renewable energy firms and Canadian partners.
  • In November 2025 the Government of Canada announced the UAE's decision to invest CAD 70 billion (USD 50 billion) in Canada. It said the discussions focused on critical minerals, energy, ports and artificial intelligence. This is UAE investment going into Canada.
  • The UAE Embassy in Ottawa estimates existing UAE investment in Canada at about USD 30 billion, nearly two-thirds of it in oil and natural gas, led by Abu Dhabi National Energy Company (TAQA).
  • The Government of Canada has said the CEPA would open the UAE market for Canadian makers of industrial machinery and power generation equipment, among others.

What changed

  • 27 October 2026Canada and the UAE signed the CEPA in Ottawa, with Annex I excluding the UAE's hydrocarbon sector. Masdar and Natural Resources Canada signed an Energy Cooperation Arrangement.
  • 19 May 2026The Canada-UAE investment agreement (FIPA) entered into force.
  • 21 November 2025The Government of Canada announced the UAE's decision to invest CAD 70 billion (USD 50 billion) in Canada.

This page is general information, not legal or tax advice.

© 2026 NordGulf Alliance FZE LLC. You may read, share and quote this page free of charge, with credit to the NordGulf Institute. It may not be sold, resold or republished for commercial use without our written permission.

© 2026 NordGulf Alliance · All Rights Reserved

Norway · Sweden · Finland · Denmark · UAE · KSA · Switzerland

Nordgulf Alliance FZE LLC  ·  Licensed by Sharjah Publishing City Free Zone Authority  ·  Registration No. 4422720

Business Centre, Sharjah Publishing City Free Zone, Sharjah, United Arab Emirates

© 2026 NordGulf Alliance. All rights reserved.

Privacy and cookies